ɫɫÀ²

News

Detailed schedules for blasting work

NCC Suomi Oy will continue preliminary works generating environmental noise at Metallimiehenkuja 6-8, Otaniemi. The works will proceed with demolition, drilling, and the blasting that started on March 13th. The excavation phase will include pre-splitting drilling and blasting.
Metallimiehenkuja 6-8

The blasting work has now started and will continue on weekdays within the following time windows: 

  • from 9.30–9.45 
  • from 11.15–11.30 
  • from 13.30–13.45 
  • from 15.30–15.45 

General high noise level work will continue according to the previously distributed schedule from February 3 to November 15, 2025, on weekdays from Monday to Friday within the period from 7:00 AM to 6:00 PM and, if necessary, every other Saturday within the period from 9:00 AM to 5:00 PM. Regular construction work may also be carried out outside these time windows.

Pedestrians are advised to pay attention to heavy traffic near the construction site.

More information:


NCC Suomi Oy, Supervisor Jari-Pekka Valtonen, p. 010 507 51 (NCC switch)

Lisään tänne tietoa Metallimiehenkuja 6-8:sta ja opiskelija-asuntohankkeesta.

Demolition work and test blasting on Metallimiehenkuja

NCC Suomi Oy will conduct exploratory excavation, drilling and blasting work.

News
Osa Metallimiehenkuja 6-8 puretaan

Construction site at Metallimiehenkuja started in February

The construction site causing noise and heavy traffic in Otaniemi started in February.

News
  • Updated:
  • Published:
Share
URL copied!

Read more news

Microscope image of wavy skin tissue layer, pink and purple cells forming dense clusters
Cooperation, Studies, University Published:

Apply now: Bioengineering human tissue: Design, fabrication, analysis

Unite!’s Blended Intensive Programme (BIP) on bioengineering human tissue combines online learning with hands-on training in Germany.
Two people carrying a sign with 'IT Services' written on it and a magnifying glass icon.
University Published:

Multifactor authentication (MFA) required for all services when logging in from outside Aalto, starting 28 April 2026

The MFA policy for Aalto Login (idp.aalto.fi) will be aligned with the policy used by other Aalto services.
Three young people talking at an outdoor event with tents behind them, wearing blue and brown jackets.
University Published:
People explore a modern indoor exhibition with wooden walls and white display tables with objects.
University Published: