ɫɫÀ²

News

Core network failure caused power outages on Otaniemi campus

Power was cut from multiple buildings on campus but returned by 15.25
campus kampus Otakaari 1 winter talvi Kuva: Mikko Raskinen / Aalto-yliopisto

Power was out at shopping centre A Bloc (Otaniementie 12), Väre building (Otaniementie 14), School of Business building (Ekonominaukio 1), Metallimiehenkuja 2 and Metallimiehenkuja 4 but returned at around 15.00. The power returned to Undergraduate Centre (Otakaari 1) at around 15.25.

The problem was in the core network. The power failure began at 14.03.

  • Updated:
  • Published:
Share
URL copied!

Read more news

Microscope image of wavy skin tissue layer, pink and purple cells forming dense clusters
Cooperation, Studies, University Published:

Apply now: Bioengineering human tissue: Design, fabrication, analysis

Unite!’s Blended Intensive Programme (BIP) on bioengineering human tissue combines online learning with hands-on training in Germany.
Two people carrying a sign with 'IT Services' written on it and a magnifying glass icon.
University Published:

Multifactor authentication (MFA) required for all services when logging in from outside Aalto, starting 28 April 2026

The MFA policy for Aalto Login (idp.aalto.fi) will be aligned with the policy used by other Aalto services.
Three young people talking at an outdoor event with tents behind them, wearing blue and brown jackets.
University Published:
People explore a modern indoor exhibition with wooden walls and white display tables with objects.
University Published: