ɫɫÀ²

News

Full scale structure test

We made a mockup of one of Kide's four trusses at 1:1 scale to test assembly and handling.
Students wearing helmets outside in the snow, with a large part of the timber structure next to a crane.

Kide will be built on-site within a short period, so it was essential to get an idea of how long it takes to properly manoeuvre each large component with the help of a crane. Making a full scale mockup was a great way to learn what to do and what to avoid. We concluded that strong planning, effective communication and making sure everyone around knows what to do are the most important.

Assembling the truss was also good for getting a sense of scale and to understand the weight and size of individual components, which had thus far only existed in our drawings and models. This was a particularly impressive moment as it was the first time we experienced the full height of the structure, which is over 9m.

While taking the truss down the next day we were caught by takatalvi, the typical moment in Finland when winter comes back one last time during spring.

ㅤㅤ

Truss being attached to the crane by students and crane driver
Student hanging from a rope from the raised structure
The truss lying on the ground waiting to be lifted, students standing around wearing safety gear
Student hanging from a rope from the raised structure
The truss lying on the ground waiting to be lifted, students standing around wearing safety gear
Students watching through a window as the truss is being lifted
The truss lying on the ground waiting to be lifted, students standing around wearing safety gear
Students watching through a window as the truss is being lifted
Truss standing, from a distance
Students watching through a window as the truss is being lifted
Truss standing, from a distance
Students watching while standing on scaffolding
Truss standing, from a distance
Students watching while standing on scaffolding
Student standing on scaffolding attaching straps to crane hook
Students watching while standing on scaffolding
Student standing on scaffolding attaching straps to crane hook
Truss being attached to the crane by students and crane driver
Student standing on scaffolding attaching straps to crane hook
Truss being attached to the crane by students and crane driver
Student hanging from a rope from the raised structure
  • Updated:
  • Published:
Share
URL copied!

Read more news

Four students sitting on outdoor steps, talking and laughing with books and a tablet by modern buildings
Studies Published:

Aalto University and Bocconi University to launch a double degree programme in strategic and creative marketing

The first cohort, 10 students admitted through Aalto and 10 through Bocconi, will start their studies in autumn 2027
Three young people take a selfie on a sunny city viewpoint, with rooftops and trees stretching behind them.
Cooperation, Studies, University Published:

Student exchange in Europe? Unite! can take you there

Aalto is a member of Unite!, a European university alliance that gives students the opportunity to internationalise their degrees both online and in-person. Join the webinar to find out more.
Euroopan unionin osarahoittama
Cooperation, Studies Published:

Opinion: Finnish language learning should be integrated into degree programs

In this opinion piece, Rebekka Nylund, an expert at the University of Helsinki, and Elisa Räsänen, a university lecturer at Aalto University, reflect on what they have learned from the EU-co-funded Language-supported Knowledge Pathways project and offer suggestions on how and why learning Finnish could be integrated into the structures of higher education degree programs.
Group of students sitting on grass outside a building, reading books and chatting in the sun
Studies, University Published:

Build Your Brand: LinkedIn Strategies for Doctoral Researchers

Have you ever wondered why your LinkedIn profile is not attracting recruiters, collaborators, or new opportunities? Are you unsure whether to share your publications, or how often you should post at all?