ɫɫÀ²

News

Developing Lumilyhty

After the selection of the Lumilyhty design, we set about finding the essence of the proposal and developing it into a buildable project.
Image of various wooden scale models showing snowflake-like structures and fractal geometries
Process models at scale 1:50

Lumilyhty requires much work before it will be a buildable design. We started the process by identifying the pros and cons to determine what to prioritise, using a SWOT analysis:

Strengths:

  • light, playful design
  • adaptability of concept
  • few points of ground contact

Opportunities:

  • modularity (effient prefabrication)
  • flexibility of use
  • maximise use of local timber

Weaknesses:

  • exposed timber due to no roof
  • excessive non-structural elements
  • limitations in stage functionality

Threats:

  • safety and security
  • complexity of structure/build time
  • maintaining design intentions
A hand holds up a model of the Lumilyhty proposal, made of wooden sticks showing snowflake like shapes

The main findings of the analysis were that priority was to develop a roof for weather protection of both the structure and the users. Simultaneously studying which parts of the proposal we wanted to keep and which ones should be changed, students individually and in groups developed design solutions and proposals at various scales.

After a month of development, which included intermediate presentations to the client, we settled on the shape that basically is Kide now. It features a square plan with a diagonal roof ridge. This arrangement allows us to align all structure and other components with the 30° angled facades. The strong roof line and pointed elevation are a distinctive addition to the square and the open front and back sides allow the rich timber structure to be visible from outside.

ã…¤

    Rendered image of Kide, showing the pointed structure on the square at nighttime with people standing around and lighting inside
    Image of Kide from up close looking upwards into the timber structure.
    • Updated:
    • Published:
    Share
    URL copied!

    Read more news

    Opiskelijanaisia jäätelöllä Korkeakoulunaukiolla. Kuva: Aalto-yliopisto / Petri Anttila
    Studies Published:

    Summer digest for doctoral students

    Suggestions and reminders for the summer months
    Person in front of a laptop.
    Cooperation, Studies, University Published:

    FITech Network University's new project increases the network’s capabilities in continuous learning

    FITech's new FITech FORWARD project aims to develop the member universities’ ability to create offerings of continuous learning and micro-credentials to meet the current skill needs in the field of technology. Besides Aalto University, also Tampere University, University of Oulu, and University of Vaasa are involved in the project.
    Students during the Opening Ceremony of the Information Technology Program on June 2nd, 2025.
    Studies, University Published:

    Celebrating 30 Years of Innovation: Aalto University's Information Technology Program Turns 30

    This summer, Aalto University’s Information Technology Program (ITP) celebrates its 30th anniversary. Founded in 1995, ITP is a full-time, three-month (30 ECTS) summer minor that brings together students from around the world and across disciplines.
    Inventors Programme panel
    Studies Published:

    Turning Research into Impact: Insights from the Inventors Program Panel

    Aalto University’s Inventors Program recently hosted a panel discussion bringing together experts from research, entrepreneurship, and industry to share their perspectives on turning scientific ideas into successful ventures.