Access control on Aalto University campus
HSY's contstruction site remains in place on Konemiehentie
Exception routes in the Konemiehentie - S盲hk枚miehentie area will continue approximately until the end of October 2021.
Outdoors areas and pedestrian routes will be improved near Otakaari 1 and Dipoli
The pedestrian connection from the metro to Dipoli and the Amphitheater Square area will be improved during the autumn of 2021. The aim is to create comfortable, versatile, safe and accessible outdoor areas, respecting original design solutions and implementations. The construction sites will start already in August.
Otaranta closed to motor vehicle traffic from week 34 onwards
Otaranta closed to motor vehicle traffic from week 34 onwards
Eastern pedestrian and cycling route of Otaniementie will be closed between Otaranta and Kuusisaarentie in week 33
Eastern pedestrian and cycling route will be closed in week 33 (week starting 16.8).
Night work at Raide-Jokeri construction site during July
Night work will be done at Raide-Jokeri construction site during July
Check out the Aalto University Works K3 site online
A Webcam has been installed to the Aalto Works K3 site to follow the real-time situation. The site has been started up during the spring 2021.
鈥楾he building designed by my father and Woldemar Baeckman really is magnificent鈥
Asko Harmia, the son of architect Hugo Harmia, visited the former School of Business building designed by his father and Woldemar Baeckman.
Shopping centre A Blanc opens in Otaniemi during summer
Designed by Alvar Aalto, the building previously known as Otaniemi鈥檚 old shopping centre, currently shopping centre A Blanc, was modernised to serve diverse business operations with respect to its historical value.
A student centre will be built as a joint meeting place for Aalto University students
The building, to be built at the heart of the campus, will be implemented as a joint effort by student organisations and the university.
Route to Maarintalo and Terveystalo is changing
The beginning of the S盲hk枚miehentie will be closed again and the driving route to Maarintalo will be made through the ISS depot / Otakaari 8 parking area.
Aalto University鈥檚 TUTLI project eParkly gathers the parking related data on the A Grid parking area to develop future parking solutions
eParkly pilot begins on the A Grid parking area (A Grid B Otakaari 5, area code 541) on Monday 29th of March 2021. eParkly is a platform for providing a better parking experience to car drivers by real-time sensing of parking area utilization rates.
Interruption of district heating distribution in the following properties: Betonimiehenkuja 3 and 5
District heating will be suspended in Betonimiehenkuja 3 and 5 due to maintenance work. The interruption will occur on Thursday, March 25 starting at 8am until 4pm.
Slowness in the Aalto Space application
Aalto Space application will be updated and improved between 11th and 19th March and there may be slowness in the application during this time.
Excavation on Otaniementie to start 3rd March
The excavation work will take place on Otaniementie at the northern and southern sides of Otakaari junction from Wednesday 3rd March.
New users to renovated Aalto University T枚枚l枚
The renovated former main building of the School of Business, Aalto T枚枚l枚, has come to life with the commissioning of the building. Two new users have been secured in the office spaces of the upper floors.
Are you interested in urban gardening in Otaniemi? Apply for a plot now!
The application period to gardening plots next to Ossinlampi pond runs until 9 March 2021
Campus is just a click away
The new virtual campus tour allows users to experience the Aalto University campus from anywhere in the world.
Public artworks at Aalto University T枚枚l枚 reflect the building鈥檚 materials and details
Impressive works by Sakari Kannosto and Kristina Riska are placed in the staircase and lobby areas.
Otaniemi鈥檚 shopping centre will be renamed A Blanc
The renovation of the beautiful building designed by Alvar Aalto will be completed by summer.
Aalto University Works K3 site is starting up
The Aalto University Works K3 project is starting as planned during February with the renovation of the 鈥淪easide section鈥, continuing with the demolition of the old office wing and the construction of the new section.