ɫɫÀ²

News

245 results for News, Aalto University Campus & Real Estate

Student-priced lunch from Subway Otaniemi

Did you know that Subway Otaniemi provides a Kela-supported student lunch on weekdays?
Campus
Published:
Opiskelijat tilaamassa lounasta Subway Otaniemessä

Factory Otaniemi salad bar opens 4 April

Factory Otaniemi salad bar opens on Monday 4 April 2022. The salad bar is located in connection with the Factory Otaniemi buffet restaurant in startup hub A Grid (Otakaari 5) on the ground floor of the G wing with a view over Ossinlampi.
Campus
Published:
Salaattiaineksia vitriinissä

Sustainable Campus Event drew crowds to A Grid

In the spirit of Earth Hour, the Sustainable Campus team organized the Sustainable Campus event on March 24, 2022 at A Grid. The theme of the event this time was natural biodiversity and the dialogue between man and nature.
Campus
Published:
Image of a three during springtime

Welcome to hear the latest news from Sustainable Campus!

Do you want to know more about the Carbon Neutral Campus 2030 project? Or about the biodiversity in campus nature? Do you need to calm down and take a silent moment without IT devices? You are welcome to join our Sustainable Campus event on 24th March!
Campus, University
Published:
Image of a three during springtime

Jokeri Light Rail contact lines installed in March

Construction of the Jokeri Light Rail system is nearing completion in Otaniemi.
Campus, University
Published:
A machine fixing contact lines over tracks.

Otakaari 2A and 2B construction will start 21 February

Otakaari 2A and 2B construction will start during February.
Campus, University
Published:
Illustration image of a spring or summer view from Otakaari towards Väre, Otakaari 2B on the right side of the image, sun is shining, there are flowers in bloom on the left of the image. Lots of people walking, cycling and interacting near the building.

Student, are you Aalto University’s next campus guide?

As a campus guide, you provide the personnel, visitors and other members of our community with memorable campus experience
Campus, University
Published:
Kauppakorkeakoulun edusta

The competition proposals for the Otaniemen Tietokorttelit architecture competition are now available for public feedback

Competition proposals for the Otaniemen Tietokorttelit architecture competition for Biology and Marine Technology area were submitted in January and the jury will now review the proposals. The winner of the competition will be selected during the spring 2022.
Campus
Published:
Otaniemen Tietokorttelit alueen rajaus

Kuntokeskus Liikku fitness club opens in A Bloc

Fitness club Liikku Otaniemi will be opened on 2 February 2022 at 12 noon on the second floor of shopping center A Bloc. Check the opening offers and test the gym for free.
Campus
Published:
Nainen treenaamassa kuntosalilla

Opening hours of shopping center A Bloc will expand

From now on, shopping center A Bloc will be open from Monday to Sunday from 5 am to 12 midnight with the opening of the Liikku Otaniemi fitness club.
Campus
Published:
A Bloc ja Korkeakouluaukio talvella

Where would you like to sit down, which part of the campus needs garden benches? Leave your proposal!

Propose where new garden benches and different kinds of plants will be set up to the campus in spring 2022.
Campus
Published:
Parkly puutarhapenkit

Colliding students and startups in A Grid’s Omnia Makerspace

Omnia Makerspace was launched in startup hub A Grid’s first floor opposite Restaurant Factory in April 2019. Since then, the space has evolved from an empty basement into a flourishing workspace where students and startups collide.
Campus, Cooperation
Published:
Omnia Makerspace ja studio

Two linden trees near Otaniementie to be renewed

The trees will soon be given a new life as decaying wood art.
Campus, University
Published:
Havainnekuva

Plastic and carton collection to every building on the campus

Waste sorting is changing on the campus at the beginning of the year 2022. Plastic and carton collection points will be added to break rooms.
Campus
Published:
Lajittelu

Dipoli and Undergraduate Centre outdoor construction sites paused for winter

The work is to be completed by summer 2022.
Campus, University
Published:
campus kampus Otakaari 1 winter talvi Kuva: Mikko Raskinen / Aalto-yliopisto

Two new buildings to be built in the centre of Otaniemi campus

Building Otakaari 2A & 2B begins in January 2022, construction to be completed by summer 2023
Campus, University
Published:
Illustration image set in sunset, depicting Otakaari 2 buildings in the future. People walking around and the lights are on in the building.

Rakentajanaukio parking area to partly close temporarily

Half of the parking area will be closed during December 2021 due to the HSY water supply renovation site.
Campus, University
Published:
Rakentajanaukio 4

A Bloc Black Week - Check the offers!

A Bloc goes Black 22-28 November 2021. Check out the offers now!
Campus
Published:
A Bloc Black Week 22.-28.11.

Construction of Jokeri Light Rail 75% complete – rail construction progressing ahead of schedule

The construction of Jokeri Light Rail has proceeded ahead of schedule, and the light rail line can start operating in early 2024
Campus
Published:
Raide-Jokeri

Kuntokeskus Liikku opens a fitness club in A Bloc

A spacious and bright Kuntokeskus Liikku fitness club will be opened on the second floor of shopping center A Bloc in early 2022.
Campus
Published:
Nainen kuntosalin pukuhuoneessa